New Construction Home Inspection

 

This is typically a three-phase inspection that will be customized to your needs. A report of findings along with digital photos are prepared after each of the first 2 phases with the completed inspection report and maintenance manual delivered after the final walk through in phase 3. These phases are: 

Phase 1

Before backfilling the foundation, we check for:

§         Proper dewatering system installation

§         Proper sealed foundation walls

§         Proper lot contour and grades

Phase 2

Before drywall is installed, we check for:

§         Missing, damaged, or undersized framing, insulation, foundation walls, concrete floors, and rough other framing components

§         Exterior building wrap, window and roof flashing systems and components

§         Electrical cabling, devices, boxes and fittings (not capacity or adequacy)

§         Plumbing water supply, drain waste vent and fuel gas piping. Proper slope of waste piping. Attachment and separation from wood of water supply lines

§         HVAC – mechanical and distribution components (not system balance or adequacy)

Phase 3

Before final acceptance and settlement, we conduct:

§         A final inspection of the home

§         Customize the report to your systems and components

§         Document any findings and prepare a final punch list for the contractor

This customized report will then be customized to a home maintenance/reference manual that you can use to identify the cause and cure of problems you may discover years from now.


Palatine, Rolling Meadows, Arlington Heights, Barrington, South Barrington, North Barrington, Barrington Hills, Inverness, Hoffman Estates, Schaumburg, Mt. Prospect, Prospect Heights, Buffalo Grove, Long Grove, Lake Zurich, Wheeling, Mundelein, Kildeer, Deer Park, Des Plaines, Elk Grove Village, Streamwood, Lake Barrington, Lake County, Cook County